Capabilities Process Projects HSE Tenders Start a Bid
Site active — 6 lines of work running

We build
the hard stuff.

Sitecore Build is a heavy-construction EPC contractor: civil, structural and M&E works delivered under one site team, one programme and one standard of safety.

5Phase delivery
6Discipline lines
24/7Site response
1Safety standard
Zero harm first Right first time Plan the work Work the plan No surprises On time or ahead Shut the gate
The Contractor's Contractor

Engineering judgment on paper. Iron discipline on site.

We take projects where interface risk is highest — multi-trade plants, logistics infrastructure and commercial buildings — and run them with the same methods: a locked baseline, weekly look-aheads and daily safety stand-downs.

If it can be built, it can be built to plan.

Capabilities

Six lines of work. One site standard.

Hover a card to flip it — the front is what we do, the back is how it is controlled on site.

LINE / 01

Civil & Structural

Earthworks, piling, reinforced concrete and structural steel for industrial and commercial sites.

Flip for controls

Site controls

  • Survey checkpoints & benchmark control
  • Concrete cube & steel MTC tracking
  • Pour-card sign-off discipline
  • Weekly settlement monitoring
LINE / 02

Mechanical & Electrical

HVAC, power, fire protection and building automation — installed, tested and commissioned as one package.

Flip for controls

Site controls

  • First-fix / second-fix inspection gates
  • Megger & loop test certification
  • TAB reports before handover
  • Red-line to as-built discipline
LINE / 03

Industrial Plants

Process buildings, utility systems and equipment bases for manufacturing and logistics operations.

Flip for controls

Site controls

  • Critical-path look-ahead every Friday
  • Equipment setting tolerance checks
  • Vendor mechanical-completion walks
  • Punch-list closure before handover
LINE / 04

Procurement & Logistics

Spec-driven buying, source inspection and just-in-sequence delivery to a live construction schedule.

Flip for controls

Site controls

  • Material status board updated daily
  • Factory acceptance tests witnessed
  • Delivery windows matched to trades
  • Free-issue tracking for client items
LINE / 05

Project Controls

Baseline schedules, earned-value reporting and risk registers that tell the truth about the job.

Flip for controls

Site controls

  • Weekly earned-value variance report
  • Two-week look-ahead commitments
  • Change log with owner sign-off
  • Risk review at every gate
LINE / 06

Maintenance & O&M

Planned preventive maintenance and 24/7 call-out response that keeps delivered assets running.

Flip for controls

Site controls

  • Asset register with PPM calendar
  • Response SLAs agreed in writing
  • Spare-parts hold point management
  • Logbook review on every visit
Delivery Method

Five phases. Five gates. No shortcuts.

The orange line fills as you scroll — each gate must be shut before the next phase is opened. That is the whole discipline.

01 Gate — Baseline

Mobilise

Site establishment, survey control, HSE induction and the baseline programme locked with the owner.

02 Gate — Design

Engineer

Shop drawings, method statements and material approvals — engineered before a single purchase order flies.

03 Gate — Buy

Procure

Approved vendors, source inspection and sequenced deliveries that match the site's weekly plan.

04 Gate — Build

Construct

Supervised trades under permit-to-work, with daily stand-downs and weekly earned-value reporting.

05 Gate — Handover

Commission

Testing, commissioning, as-builts and operator training — closed out with a signed handover record.

GATE RULE: no phase opens until the previous gate is signed. This is a template preview — process figures shown are our standard method, not project statistics.
The Sitecore Standard

A schedule you can stand on.

Every morning starts with a safety stand-down. Every week ends with an honest progress report. When owners visit our sites they see the same thing: organised work, controlled risk and a programme that holds.

Permit-to-work Weekly look-ahead Gate discipline Zero harm
0 Lost-time incidents — the standing target
5 Gates on every project
6 Discipline lines running
100% Permit coverage — no permit, no work
Project Boards

Work on the boards right now

Representative project profiles across our discipline lines — shown as site boards, the way the team tracks them.

#01 Steel structure of an industrial building under construction INDUSTRIAL / STRUCTURAL STEEL

Distribution Centre Steel Package

Structural steel erection and envelope works for a regional distribution facility, sequenced around live logistics operations.

Civil + SteelAsia-Pacific
#02 Engineer in hi-vis reviewing plans inside an industrial plant PLANT / M&E RETROFIT

Process Plant M&E Retrofit

Mechanical and electrical upgrade of an operating process line, executed under phased shutdown windows with zero lost-time incidents.

M&E PackageSoutheast Asia
#03 Tower cranes working over a commercial high-rise site COMMERCIAL / HIGH-RISE

Commercial Tower Core & Shell

Core and shell construction with full M&E coordination for a commercial high-rise, delivered against a fixed topping-out date.

Core + ShellGreater China
HSE Notice Board

The rules on the board are the rules on the ground

Safety is not a poster. It is the permit system, the induction, the inspection record and the right of every person on site to stop the work.

SITE SAFETY NOTICE

Rev. C-04  /  Applies to all persons on site

Permit to Work

No hot work, lifting, excavation or confined-space entry without a signed permit reviewed at the morning stand-down.

  • Daily permit board review
  • Isolation lock-off procedure
  • Competent-person authorisation

Quality on Site

Inspection and test plans govern every trade. Nothing is covered up until the hold point is signed.

  • Hold-point sign-off
  • Material test certificates filed
  • Punch lists closed weekly

Site Environment

Dust, noise, waste and water are managed as site hazards — measured, controlled and reported like schedule.

  • Waste segregation stations
  • Wheel-wash & dust control
  • Spill kit on every level
Management Systems

Site procedures are modelled on ISO 9001 quality, ISO 14001 environmental and ISO 45001 occupational health & safety frameworks. Certification scope for each legal entity is shared during prequalification.

Tender & Cooperation

Bid with us — early

The earlier a contractor is in the room, the more value they can add: buildability reviews, package splitting and honest budgets. Here is the path.

  • 01

    Send the package

    Drawings, scope notes or a simple brief. We acknowledge within two working days and sign your NDA.

  • 02

    Buildability review

    We walk the scope with your team and return a marked-up review with open questions — before pricing.

  • 03

    Budget & programme

    A phased budget with assumptions listed, plus a working programme you can interrogate line by line.

  • 04

    Award & mobilise

    Contract, insurance, inductions, site establishment — and the first Monday-morning stand-down.

Start a bid conversation

Tell us what you are building and we will respond with the next step.

Demo form for template preview — submissions are not stored.

Trade Partners

Register as a trade partner

We are always qualifying new subcontractors, fabricators and materials suppliers. If your safety record, quality systems and pricing are solid, there is work on our boards for you.

Direct package invites

RFQs only for the trades and regions you register — no spam tenders.

Safety prequalification

Induction and permit compliance before mobilisation — no surprises for your crews.

Milestone payments

Payment schedules agreed in writing before works start — and honoured on the date.

Trade partner registration

Demo form for template preview — submissions are not stored.

Let's Build

Bring us the difficult one.

The projects everyone says are hard are the ones our method was built for. Send the package — we will send back an honest answer.