Ironworkers setting reinforcement on a steel-frame construction site at dawn

Est. 1998 · Licence SF-4471-E · ISO 9001 / 45001 / 14001

Engineering the steel that holds everything up.

Structural, civil, mechanical and electrical engineering under one roof — modelled, fabricated and installed by a single accountable team, from foundation bolt to final commissioning.

Operating since
1998 · 26 yrs
Schemes delivered
1,284
EMR (3-yr avg)
0.68 ▼
Markets
9 countries

00 / Practice

One accountable engineer of record, four disciplines, zero interface risk.

Most projects fail in the gap between trades. SteelFrame keeps structural, civil, mechanical and electrical analysis inside one model and one contract, so a beam penetration is resolved in the drawing rather than discovered on site.

In-house engineering, not subcontracted

42 chartered engineers, 9 BIM technicians and our own fabrication yard under one QA system.

Clash-free federated model before cut steel

Every package coordinated to LOD 400 — the single biggest lever on programme certainty.

Safety engineered, then audited

Buildability and lifting reviews at design stage; independent monthly site audits thereafter.

01 / Services

Four disciplines. One engineering standard.

Each discipline is led by a chartered principal engineer and delivered against the same QA system, so a steel connection, a cable pull and a duct route are all documented to the same review gate.

Scope4 disciplines · 26 work packages
S01–07

Structural engineering

Frames that are economical to erect and honest about their load path — modelled, analysed and connection-detailed in-house.

  • Steel frames
  • Concrete
  • Connections
  • Foundations
  • Facades
Typical deliverables
Global analysis & vibration study Connection design reports Fabrication & erection drawings
C08–14

Civil & site works

Ground to platform: earthworks, drainage, retaining structures and the infrastructure that keeps a site dry and level.

  • Earthworks
  • Piling
  • Drainage
  • Roads
  • Retaining
Typical deliverables
Geotechnical interpretation Setting-out & earthwork models Drainage & flood calculations
M15–20

Mechanical & process

HVAC, pumping, piping and process plant — sized, coordinated, fabricated and pressure-tested as one installation.

  • HVAC
  • Piping
  • Pumping
  • Plant rooms
  • Ductwork
Typical deliverables
Load & psychrometric calcs P&ID and piping isometrics Pressure test & flush records
E21–26

Electrical & controls

LV/MV distribution, earthing, standby power and the control systems that let the building be operated, not just energised.

  • LV / MV
  • Earthing
  • Generators
  • BMS / SCADA
  • Lighting
Typical deliverables
Load schedules & discrimination study Single-line & layout drawings Testing, commissioning & O&M

02 / Project portfolio

Delivered, handed over, still standing.

Nine representative schemes from the last four years. Filter by discipline — every project below was engineered, fabricated or installed by our own teams.

Sheet P-1002022 — 2026

9 schemes shown

Erection crew in high-visibility vests assembling a steel frame on a multi-storey site
Structural
S-402

Harbour Point Tower

38-storey composite frame with a 62 m clear-span transfer truss over the podium road.

ValueHK$ 412M
Duration26 months
LocationKowloon Bay
Discuss a similar build
Multistorey scaffolding and temporary works structure wrapped around a building under construction
Structural
S-388

Foundry Quarter Retrofit

Seismic upgrade and temporary works design for a 1912 foundry retained in full operation.

ValueHK$ 96M
Duration14 months
LocationKwun Tong
Discuss a similar build
Long-span steel truss geometry seen from below against the sky
Structural
S-455

Northgate Arena Roof

Diagrid roof over a 9,400-seat arena, erected in 14 night-time crane lifts over a live venue.

ValueHK$ 168M
Duration11 months
LocationSha Tin
Discuss a similar build
Excavator carrying out bulk earthworks on a large civil site
Civil
C-311

Westland Logistics Park

480,000 m³ bulk earthworks, 4.2 km of drainage and platform formation for eight warehouses.

ValueHK$ 224M
Duration19 months
LocationYuen Long
Discuss a similar build
Cast concrete columns and ramps inside a below-ground civil structure
Civil
C-297

Kowloon Interchange

Three-level underground interchange box with top-down excavation and contiguous piling.

ValueHK$ 690M
Duration34 months
LocationHo Man Tin
Discuss a similar build
Stainless steel process pipework and cooling coils in an industrial plant room
Mechanical
M-214

Coldstore Plant Rooms

Six ammonia refrigeration plant rooms, 1.9 km of pre-insulated pipework and full pressure testing.

ValueHK$ 148M
Duration16 months
LocationKwai Chung
Discuss a similar build
Welder in a visor joining a steel fabrication with sparks flying
Mechanical
M-233

Steelworks Fabrication Bay

2,400 t of process steelwork fabricated and welded to ISO 3834-2, with full NDT traceability.

ValueHK$ 87M
Duration9 months
LocationTuen Mun
Discuss a similar build
Electrician in a hard hat terminating an electrical distribution switchboard
Electrical
E-176

Container Terminal MV Upgrade

11 kV ring replacement across a live terminal with zero unplanned crane downtime.

ValueHK$ 262M
Duration21 months
LocationKwai Tsing
Discuss a similar build
Engineers monitoring building management and SCADA systems on control-room screens
Electrical
E-198

Airport BMS & SCADA

42,000-point building management system integrated over a live 24/7 airport concourse.

ValueHK$ 134M
Duration18 months
LocationChek Lap Kok
Discuss a similar build

No schemes in this discipline yet — ask us for the reference list.

03 / Safety record

Numbers we are happy to be judged on.

Reported against 3.2 million site man-hours in the last rolling year, verified by our independent safety auditor. Every figure below is a rolling twelve-month measure, not a best year.

Sheet HSE-01Rolling 12 months

0.41

TRIR

Total recordable incident rate per 200,000 hours — industry benchmark 2.90.

3.24M

Man-hours worked

Across 34 active sites and 2 fabrication yards in the last 12 months.

1,847

Days LTI-free

Since our last lost-time incident — five years and counting, company-wide.

0.68

EMR

Experience modification rate, three-year average. Below 1.00 qualifies for reduced premiums.

Zero-Harm pledge · signed by every site
  • Daily pre-task planning before any lift, hot work or confined space entry
  • 100% fall-arrest compliance above two metres, audited weekly
  • Stop-work authority held by every worker, with no comeback
  • Certified rigging and engineered lift plans for every pick over 10 t
  • Toolbox talks logged weekly, in the first language of every crew
  • Independent monthly audits with findings published to the client
Two engineers in full PPE and fall-arrest harnesses working at height against a blue sky
Fall arrest · 100% compliance Harness inspection and anchorage verification logged per shift on every frame above two metres.
Safety hard hat and high-visibility equipment staged on a construction site
PPE issue · every crew Site-issued and replaced on wear, not on request.

04 / Equipment fleet

Our own plant, our own programme.

HK$ 780M of owned plant, maintained in-house and tracked with telematics. Where we own the crane and the piling rig, the lifting window is ours to protect — not a hire desk's.

Sheet EQ-0522 major units
Crawler crane — LR 13002 units · owned 300 t capacity 96 m boom Available
All-terrain mobile crane — GMK64001 unit · owned 400 t capacity 60 m main boom On project
Rotary piling rig — BG 282 units · owned 1,200 kNm torque 32 m bore depth Available
Truck-mounted concrete pump — BSF 363 units · owned 160 m³/h output 36 m boom Available
Boom lift — S-85 XC6 units · owned 27 m working height 230 kg platform Available
CNC structural beam line1 line · fabrication yard 1,200 mm section depth 4,800 t/yr throughput In service
Telehandler — 12 t4 units · owned 12 t lift 17 m reach Available
Fleet ledger · 2026
Major plant units owned22
Fleet replacement valueHK$ 780M
Telematics-tracked assets100%
Maintained by our own workshops94%
Planned-maintenance compliance99.1%
Average fleet age4.6 years

Every lifting appliance carries a current thorough examination certificate; registers are issued to the client at mobilisation and on each re-inspection.

Steel sections and materials stored in racks at an engineering fabrication yard
Materials & section store · Tuen Mun

05 / Certifications

Audited, accredited, on the record.

Certificates are held by SteelFrame Engineering Group and cover design, fabrication and site installation. Current copies are issued with every tender submission.

Sheet QA-02Valid · reviewed annually
Valid

ISO 9001:2015

Quality management

Design, fabrication and site installation of structural, civil and M&E works under a single audited quality system.

CertificateQMS-4471-01
ExpiresNov 2027
Valid

ISO 45001:2018

Occupational health & safety

Company-wide OH&S management system covering all sites, yards, workshops and temporary works.

CertificateOHS-4471-02
ExpiresFeb 2028
Valid

ISO 14001:2015

Environmental management

Waste, water, noise and carbon reporting across active sites, with published annual reduction targets.

CertificateEMS-4471-03
ExpiresMay 2027
Valid

EN 1090-2 · EXC 4

Execution of steel structures

Highest execution class for structural steelwork, with CE marking and factory production control to FPC 4.

CertificateFPC-1090-EXC4
ExpiresAug 2027
Valid

ISO 3834-2

Fusion welding quality

Comprehensive quality requirements for fusion welding, covering WPQRs, welder qualification and NDT records.

CertificateWELD-3834-2
ExpiresJan 2028
Valid

ASME IX · AWS D1.1

Welder & procedure qualification

Procedure and personnel qualification for pressure and structural welding, with third-party witness records.

RegisterWQR-2026-118
ReviewedQuarterly
Also accredited
  • ISO 19650 BIM
  • ISO/IEC 17025 test lab
  • NEBOSH-trained HSE team
  • Chartered engineering practice
  • Registered specialist contractor
  • HK$ 500M works insurance
Request credentials pack

06 / Quote request

Send us the scope. We answer with an engineer.

Tell us the discipline, scale and location. A principal engineer reviews every enquiry — you get a named contact, an indicative range and a programme view, not a brochure.

Sheet Q-01Reply within 1 working day

Project enquiry

Fields marked * required
Sent from your browser only

Demo form — nothing is transmitted. Wire it to your endpoint before launch.

Enquiry logged — reference SF-000000

In a live build this is where the request would post to your estimating inbox. Below is a copy of what would have been sent.