Residential
Custom homes, townhouse infill and multi-unit low-rise — framed, closed and finished by our own crews.
- Custom & architect-led homes
- Townhouse & low-rise infill
- Extensions & second storeys
- Fixed-price build packages
Est. 1978 · Licensed general contractor · Bonded & insured
Forty-seven years of residential, commercial, renovation and infrastructure delivery. One crew, one standard, from the first survey peg to the final handover pack.
01 — What we do
We self-perform structure, concrete and carpentry, and hold standing frameworks with the electrical, mechanical and civil trades we have used for over a decade. That means one contract, one programme and one crew accountable for the result.
Custom homes, townhouse infill and multi-unit low-rise — framed, closed and finished by our own crews.
Fit-out, shell-and-core and retail delivery for operators who cannot afford a late opening.
Structural upgrades and heritage-sensitive refurbishment of buildings that are still in use.
Bridges, interchanges, drainage and utility corridors delivered under public and private frameworks.
02 — Selected work
A cross-section of the last four years: a commercial tower, a hilltop residential terrace, a cable-stayed crossing, a steel refurbishment and a live-traffic interchange.
Commercial
Residential
Infrastructure
Industrial
Infrastructure
Commercial
No projects in this sector yet.
03 — Zero harm
Safety is not a section of the tender document. It is the first item on every programme, the last item on every toolbox talk, and the reason we can still say we have never had a fatality in forty-seven years of trading.
04 — Plant & equipment
Sixty-two items of owned plant, serviced on a fixed cycle by our own fitters. No hire-yard queue in the morning, no third-party operator on the critical path — and a machine that our own crews have signed off.
Fleet unit E-112
Fleet unit C-208
Fleet unit E-104 ×3
Fleet units E-118 & T-051
05 — How we work
Site walk, survey and buildability review. You get a line-item estimate with provisional sums called out, not buried — usually within ten working days.
One project manager, one weekly report with photographs, programme percentage and any variation raised before the work is done, never after.
As-built drawings, O&M manuals, commissioning records and a defects period we actually answer the phone during. Ten-year structural warranty as standard.
06 — Who runs it
Four directors, all of whom came up through the trades. You will meet them at tender, and you will still be meeting them on site in month fourteen.
Founder & Chief Executive
Started as a formwork carpenter in 1978. Still walks every site he tenders.
Director of Operations
Runs the programme across all four disciplines. Eighteen years in delivery.
Head of Engineering
Chartered structural engineer. Signs off every temporary works design we use.
Safety Director
Ex-site foreman. Holds the stop-work authority he hands to every new starter.
07 — Start a project
Send the outline and we will come back with a buildability note, a programme sketch and an indicative range — before you commit to anything.